该泄洪消能系统大大减轻了下泄水流对河床基岩的冲刷作用,满足了该工程的泄洪消能任务。
This flood energy dissipation system has remarkably relieved the scouring effect of plunging flow on the river bedrock and met the project's requirements for flood energy dissipation.
本文根据丁坝作用后水槽中水流情况,采用动量方程结合试验资料,导出了丁坝下游主槽平均流速沿程变化的公式,以此为基础,提出了丁坝作用下河床冲刷段长度的计算公式。
According to the flow state in flume for spur and experimental data, the formulas for the mean velocity of main channel varying with distance downstream were derived with momentum principle.
本文根据丁坝作用后水槽中水流情况,采用动量方程结合试验资料,导出了丁坝下游主槽平均流速沿程变化的公式,以此为基础,提出了丁坝作用下河床冲刷段长度的计算公式。
According to the flow state in flume for spur and experimental data, the formulas for the mean velocity of main channel varying with distance downstream were derived with momentum principle.
应用推荐