• +升后方进水口版本

    This is the L + L rear intake version.

    youdao

  • 形式其他电站进水口设计具有参考价值。

    This kind of small inlet may be served as valuable reference for other similar hydropower station.

    youdao

  • 为了保存重量复杂性进水口几何固定

    In order to save weight and complexity, the geometry of the intake was fixed.

    youdao

  • 我们进水口电源插座水槽

    We have a water inlet, which is the source, and an outlet, the sink.

    youdao

  • 主要论述三峡工程电站进水口型式及其实验结果

    The paper is intended to describe the power intake schemes in the Three Gorges project and their experiment results.

    youdao

  • 进水管直径大于水泵进水口时,安装偏心变径

    When the inlet diameter is greater than pump inlet should be installed eccentric adjustable tube.

    youdao

  • 适用于水库进水口拦污栅污物堆积情况

    It's also suitable to be used in case of thick trash accumulation in front of the reservoir dam or the intake trash rack.

    youdao

  • 进水口上方漩涡强度随来流与进水口夹角的增大增强

    The intensity of vortex above the hydraulic intakes could be strengthened as the angle between inflow and hydraulic intakes becomes larger.

    youdao

  • 如果考虑进水口内部方法医疗医生对你最佳选择

    If considering an internal method of intake, your medical physician will advise you on the best option for you.

    youdao

  • 介绍林水电站扩建工程进水口结构控制程序软件设计

    This paper introduces structure, control and program software design of extension project water inlet in ZhaLin hydroelectric station.

    youdao

  • 所有主要水库分流河道和一系列非常精细的装置进水口出水口

    There are inlets and outlets on all the major reservoirs, distributor canals, a series of very sophisticated water control devices.

    youdao

  • 为满足NPSH要求标高应该大约位于泵进水口3之上

    Tank elevation is to be approx. 3 meters above pum suction for NPSH requirements.

    youdao

  • 河流电站进水口取水排沙历来一个倍受关注的问题

    For the hydropower station built on heavily sediment-laden river, it is always a especially concerned problem to desilt at the water intake of hydropower station.

    youdao

  • 本文阐述了压板进水口优化水力设计依据目标基本方法

    The basis, the objective and the methods of optimal hydraulic design for short inlet with pressing plate are described.

    youdao

  • 特别是进水口边坡可能破坏方式一定程度上岩带的影响。

    The possible destruction styles of intake slope is influenced by the soft zones to a certain extent.

    youdao

  • 经过沟通出现一现象用户竟无一知道进水口过滤网装置

    Through communication, appear this phenomenon of users have no know have a device screen pack inlet.

    youdao

  • 分析水电站进水口工作闸门埋件安装过程遇到问题解决方法。

    The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.

    youdao

  • 获得大量蔬菜水果尝试一个进水口5部分每天水果蔬菜

    Get lots of vegetables and fruits try and have an intake of 5 portions a day of fruit and veg.

    youdao

  • 地下厂房进水口高边坡稳定龙滩水电站建设必须解决重大工程技术问题

    The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.

    youdao

  • 水电站进水口漂浮式拦污排若干浮链接索状,可简化为平面结构。

    The drift barrier installed at the intake of hydropower station for preventing the trash is a flexible system formed by linking floating tanks.

    youdao

  • 船舶自流冷却系统进水口结构船舶航行和凝器冷却效果具有显著影响

    The structure of water inlets of a marine scoop cooling system has a significant effect on the navigation of ships and the cooling efficiency of condensers.

    youdao

  • 水位下降后开关控制打开进水口水池汪水,实现自动补水

    When the water level drops, the main valve is composed of a floating ball switch control to open the water inlet to the water tank, automatic replenishment.

    youdao

  • 目的在于通过模型试验总结出电站进水口计算临界淹没水深经验公式。

    The paper presented an experimental study of the critical submergence of pressure power intakes.

    youdao

  • 立轴旋涡水电站引水管道导流隧洞溢洪道、水泵站进水口时有发生

    The vertical vortex frequently occurs at hydraulic intakes such as diversion pipeline, diversion tunnel, spillway and pumping station.

    youdao

  • 拉西水电站进水口快速闸门模型试验例,简要阐述步进电机工作原理

    It briefly describes the working principle of stepping motor based upon the gate tests at the intake tunnel for Laxiwa hydropower project.

    youdao

  • 水电站澜沧江中、下游梯级开发关键工程,其进水口高边坡地质条件复杂。

    The Hydropower Station is the key project in the cascade development in the middle and lowers of Lancang River, with complex geological condition of high rock slope at the intake.

    youdao

  • 采用刚体极限平衡小湾电站进水口边坡进行稳定分析加固方案优化

    Based on the 3d rigid limit equilibrium method, the stability of the intake slope of Xiaowan Hydropower Station is analyzed; and the reinforcement scheme is optimized.

    youdao

  • 进水口出水口设置水箱上部,且进水口位置低于出水口水平位置。

    A water inlet and a water outlet are arranged on the top of the water tank and the position of the water inlet is not lower than the horizontal position of the water outlet.

    youdao

  • 前言:通过洗衣机进水口塑件结构特点分析,设计了洗衣机进水口注射

    Based on the analysis of the structure characteristics of the water inlet of a washing machine, an injection mould for the water inlet is designed.

    youdao

  • 简要回顾了进水口高边坡设计过程,各设计阶段研究成果及重大技术决策理由依据。

    This article isa brief retrospect of high side slope design of intake, research achievements in the design period and the reason for decision.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定