• 介绍了用于尾矿具有圆形框架进水塔竖井排洪道泄流能力模型试验研究

    The discharge capacity of shaft spillway with framed inlet tower used for high tailings dam is studied by physical model.

    youdao

  • 小浪底进水塔地层呈状产出,基础范围内有裂隙发育分布较广延伸长。

    The stratum under the intake towers of Xiaolangdi project is layer occurrence with four sets of cracks developed around its base that distribute and extend in far distance.

    youdao

  • 针对百色水利工程实际情况,采用振型分解反应进水塔进行了动力分析得出合理的结论。

    For baise hydroelectric station, response spectrum of mode - superposition is applied in the dynamic analysis of intake tower. the rational conclusions are obtained.

    youdao

  • 针对百色水利工程实际情况,采用振型分解反应进水塔进行了动力分析得出了合理的结论

    For baise hydroelectric station , response spectrum of mode - superposition is applied in the dynamic analysis of intake tower . the rational conclusions are obtained.

    youdao

  • 动力计算结果静力计算结果进行叠加,对进水塔结构抗震性能进行评估,结果显示进水塔结构变形与强度均满足要求,工程设计提供了依据

    By the superposed results of dynamical and static calculations, the seismic security of the tower can be evaluated so as to supply reliable data for project designers.

    youdao

  • 动力计算结果静力计算结果进行叠加,对进水塔结构抗震性能进行评估,结果显示进水塔结构变形与强度均满足要求,工程设计提供了依据

    By the superposed results of dynamical and static calculations, the seismic security of the tower can be evaluated so as to supply reliable data for project designers.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定