• The original truss of Gezhou Dam 500 kV switching station has installation quality defects, resulting in instability problem and becoming serious hidden troubles to safe operation.

    葛洲坝500 kV开关站构架的安全稳定性不足,存在安装质量缺陷成为开关站设备安全运行的重大隐患

    youdao

  • The original truss of Gezhou Dam 500 kV switching station has installation quality defects, resulting in instability problem and becoming serious hidden troubles to safe operation.

    葛洲坝500 kV开关站构架的安全稳定性不足,存在安装质量缺陷成为开关站设备安全运行的重大隐患

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定