In its update yesterday, McMoran says it is injecting a barite solvent to clean out the perforations, or holes in the drill pipe, through which the gas will flow.
There had already been a several week delay during which MMR was trying to mechanically grind away solidified barite, an ingredient in the oil based mud that was used to contain the well when it repeatedly tried to flow before it was supposed to.