Allen said that in preparation for the storm, crews had pulled the drill string out, put a plug known as a "packer" in the casing pipe and filled the riser with seawater so the pipe would be stable.
CNN: STORY HIGHLIGHTS
应用推荐
模块上移
模块下移
不移动