Workers spent two years pouring concrete for the dam, which would have taken 125 years to cool if Crowe hadn't designed an ingenious web of pipes that pumped cold water throughout.
Yet noble intentions do not, of themselves, move concrete, even rotting concrete like the cement-and-pine-cone slurry used to make the Elwha Dam, the first of the two structures to be built.