• Up on 10B of UPMC Presbyterian, Kenagy is trying to disrupt long-established patterns of inefficiency by adapting the Toyota production system a manufacturing process that emphasizes low inventory, a high degree of flexibility and zero defects to medicine.

    FORBES: The Man Who WouldSave Health Care

  • Since oil and gas facilities are usually located in remote locations that are not easily accessible, preparation of SPCC plans prior to operation of a facility will result in production delays, additional costs and inefficiency.

    WHITEHOUSE: Meeting Materials

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定