Since oil and gas facilities are usually located in remote locations that are not easily accessible, preparation of SPCC plans prior to operation of a facility will result in production delays, additional costs and inefficiency.
Up on 10B of UPMC Presbyterian, Kenagy is trying to disrupt long-established patterns of inefficiency by adapting the Toyota production system a manufacturing process that emphasizes low inventory, a high degree of flexibility and zero defects to medicine.