A bedding fault zone in layer C5 and a fractured fault zone which determine the stability against sliding and bearing capacity of the dam exist in the dam foundation of Tongjiezi project.
铜街子水电站大坝基础存在有控制大坝抗滑稳定和承载力的C_5层间错动带和断层破碎带。
A bedding fault zone in layer C5 and a fractured fault zone which determine the stability against sliding and bearing capacity of the dam exist in the dam foundation of Tongjiezi project.
铜街子水电站大坝基础存在有控制大坝抗滑稳定和承载力的C_5层间错动带和断层破碎带。