配合酒店项目前期工程工作,并提出工程专业意见。
Provide professional advice and engineering support during the working process.
本文研究的内容是该体系中的一个重要分支——铁路建设项目前期工程造价计价标准体系。
The content of this article is one important embranchment of this system, namely the standard system of earlier stage cost making of railway project.
建设前期工程造价控制的有利途径有很多,其中优选方案、推行价值工程限额设计等都是行之有效的方法。
There are some useful measures to solve these problems, such as value engineering, limited designing, and so on.
“首要问题是前期成本问题”南卡罗莱纳大学工程副教授PaulZiehl说。
"No. 1 is the upfront cost issue," said Paul Ziehl, an associate professor of engineering at the University of South Carolina.
目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。
At present, the post-evaluation index is mainly according to project real data after it finished, and compare with assess the index in earlier stage of the project.
运量预测工作在交通工程建设的前期工作中处于十分重要的地位。
Fortune capacity forecasting work is in the very important position in the earlier stage work of traffic engineering construction.
煤炭开采工程应该把水文地质勘察工作与前期地质勘探工作结合进行,以查明基本的水文地质条件与相关参数;
Mining project should be carried out by combining hydrogeological survey with geological survey of previous period so as to establish basic hydrogeological condition and correlated parameters.
工程预可行性分析是桥梁和隧道建设前期工作的重点组成部分,往往成为项目立项的控制性因素。
Project pre-feasibility analysis, a crucial part of bridge and tunnel preparatory work construction, often becomes a controlling factor of a project.
本文阐述岭澳核电站工程建造阶段勘测地质编录内容、方法、成品整理和对前期勘测成果的现场检验。
The paper expounds the geological logging contents, method, data sorting out, and site inspection to the previous investigation reports during the engineering construction period in LANPS.
本文分析、比较了当前我们在住宅建设的前期造价控制阶段存在的问题,针对这些问题提出了相应的解决方法,为更好、有效地控制工程造价提出了意见和建议。
This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.
所有活跃市场数据包括在建项目,筹备阶段或最后筹备阶段的工程,但是不包括处于前期策划中的项目。
Total active pipeline data includes projects in the construction, final planning and planning stages, but does not include projects in the pre-planning stage.
指出面临加入WTO后的机遇与挑战,在国内建筑市场中,必须加强工程项目前期的造价管理。
Facing with both opportunity and challenge after the entry of WTO, the construction cost management of project forepart must be intensified in domestic construction market.
在前期论证阶段对工程实施过程中可能遇到的各类风险进行定量化评估,是项目科学决策的一条重要途径。
During the engineering feasibility study period, risk assessment is an important approach to the scientific decision-making of the project.
根据前期研究得出的消力池底板厚度公式,经工程实践验证,符合程度良好。
At first, it is verified that the formerly obtained formula for calculating base plate thickness of stilling basin is in good agreement with engineering practices.
我公司计划于2005年月6日进驻厂区并实施项目前期基础工程。
It is our company's plan to take site possession on 6th XXX, 2005 and commence advance works on foundations.
报告介绍隧道工程概况、前期准备工作和目前施工进展情况等。
This presentation introduces an outline of this project, pre-preparatory work and work progress to this moment.
本文的研究成果为“西气东输”工程的规划设计以及俄罗斯输气工程的前期工作提供了技术支持。
The outcomes of the research have provided technical support for both planning design of "the Gas Transmission from West to East" project and the early-stage work of Russian Gas Transmission project.
今年,衡西快速干道将开展工程前期工作,预计2013年竣工。
This year, the Heng w. rapid arterial road will evolve an engineering previous period job and anticipate to finish construction in 2013.
西陵长江大桥为三峡水利枢纽工程前期准备工程中的一项重要的交通设施。
Xiling Yangtze River Bridge is one of the important traffic facilities for preparation of the Three-Gorge Water Conservancy Key Project.
在项目前期,准确的建设工程预算是投资者据以作出正确决策的基础。
Ahead construction project proceeding, an accurate budget is the base for an investor to make a correct decision.
结合南方地区某一火电厂工程实例,探讨了地面物探技术在火电厂建设前期地质探测中的应用状况。
To combine with an example of the thermal power plate in south China, application of around geophysical prospecting technique is analyzed and discussed in construction prophase.
这为以后制备特异性抗血清,开展BBTV的快速、有效的检测奠定了基础,同时也为植物抗病毒基因工程和抗病育种研究做好了一定的前期工作。
This study lay a firm foundation not only for preparation of antiserum later and detection BBTV fast and effectively, but also for plant anti-virus gene engineer and anti-virus breeding.
在施工前,为确保工程安全,必须查明地下地质情况,因而要进行前期地质调查工作。
Before that, geological survey must be made to explore the underground structures so as to determine the safety of ocean engineering in these areas.
项目建设期间协助前期工艺准备,参加相关工程设计、施工、调试以及操作员工培训工作。
Provide assistant in process preparation of project and participate in related design, construction, commissioning and employee training.
工程造价的控制重点应在建设项目的前期阶段;
The key in the control of capital construction project cost lies in the earlier stage;
分析了工程建设前期造价控制的必要性,提出了在建设前期控制工程造价的有效途径和措施。
The necessities of controlling construction cost in the early stage of a construction project are analyzed.
该分析方法可为通风机转子系统的前期设计提供参考,对提高其整体性能具有重要工程应用价值。
The method can provide reference for optimizing the design of the rotor system, and has important value of engineering applications in the increase of the overall performance.
对开发商,我们提供样板工程的资料作为前期参考,按具体需求,我们可以提供整体项目分析和图纸方案,包括项目预算。
For the demand of developer, we supply related documents from our reference project for reference, we would like to supply whole project analysis and drawing plan, including project budget.
对开发商,我们提供样板工程的资料作为前期参考,按具体需求,我们可以提供整体项目分析和图纸方案,包括项目预算。
For the demand of developer, we supply related documents from our reference project for reference, we would like to supply whole project analysis and drawing plan, including project budget.
应用推荐