为了优化三峡电站进水口体形,试验研究采用了与传统大进水口不同的小进水口体形方式,并将进水口的喇叭口段布置成对称状。
By means of test research, a small sized inlet with a symmetrical bell-mouth form instead of traditional large sized one will be adopted for the TGP's hydropower station.
为了优化三峡电站进水口体形,试验研究采用了与传统大进水口不同的小进水口体形方式,并将进水口的喇叭口段布置成对称状。
By means of test research, a small sized inlet with a symmetrical bell-mouth form instead of traditional large sized one will be adopted for the TGP's hydropower station.
应用推荐