• 研究了最大完工时间为目标的零空闲流水线调度问题

    No-idle flow shop(NIFS) problem with makespan criterion is studied.

    youdao

  • 考虑并行加工机上不同尺寸工件调度问题目标极小最大完工时间

    The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    youdao

  • 因此问题需要决定是否中断以及何时中断,使得最大完工时间完工时间总和、加权完工时间总和尽可能小。

    Thus the problem is to make a decision on whether and when to start the breakdown so as to minimize the maximum completion time, the total completion time or the weighted total completion time.

    youdao

  • 讨论任务的加工不可中断,机器速度相同且机器具有不同开始加工时间排序问题目标函数极小化最大完工时间

    We discuss the nonpreemptive parallel machine scheduling problem with nonsimultaneous available time, the objective function is to minimize the makespan.

    youdao

  • 我们所考虑目标函数所有工件加权完工时间之和与对所有工件的实际加工时间偏离额定加工时间最大不满意程度这两部分组成。

    The objective function being considered was the sum of weighted completion times of all jobs plus the maximum dissatisfaction of all jobs processing times that deviated from their specified ones.

    youdao

  • 允许机器空闲条件,寻找一个工件排序使得最大提前完工时间最小。

    Under the condition of permission the idle insert, a job sequence was determined, which minimize the maximum earliness.

    youdao

  • 讨论这样一类单机排序问题:每个工件联系一个交货期窗口如果工件完工时间工件的交货期窗口内,则该工件的完工满意的;排序的优化准则是完工满意的工件个数最大

    In this paper, we consider such a scheduling model: a due date window is associated with each job, a job is call satisfying job if its completion time lies in its corresponding due date window.

    youdao

  • 讨论这样一类单机排序问题:每个工件联系一个交货期窗口如果工件完工时间工件的交货期窗口内,则该工件的完工满意的;排序的优化准则是完工满意的工件个数最大

    In this paper, we consider such a scheduling model: a due date window is associated with each job, a job is call satisfying job if its completion time lies in its corresponding due date window.

    youdao