• 建立了基于线性规划梯级水电系统短期发电计划通用模型

    A general model based on linear programming for short-term generation scheduling of cascade hydroelectric systems is proposed.

    youdao

  • 网络化保护信息系统在实际工作发挥作用提高了梯级水电继电保护现场运行管理水平

    This protection information system with a network function has been put into operation, and the operation and management level of relay protection of cascade hydropower plants is improved.

    youdao

  • 讨论梯级水电大型水火电力系统有功功率分配数学模型,考虑了水电厂上、下游水位的变化、梯级水电厂间的水流时间延迟等因素。

    In this paper, we discuss a mathematical mode for optimization of active power dispatch of large-scale hydro-thermal power systems with cascaded hydropower stations.

    youdao

  • 讨论梯级水电大型水火电力系统有功功率分配数学模型,考虑了水电厂上、下游水位的变化、梯级水电厂间的水流时间延迟等因素。

    In this paper, we discuss a mathematical mode for optimization of active power dispatch of large-scale hydro-thermal power systems with cascaded hydropower stations.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定