本文基于模糊数学规划及系统优化的观点研究了分组交换网络中分组路径的选择问题。
The problem of route selection of the packets in networks is studied based on the viewpoint of fuzzy mathematical programming and system optimization in this paper.
对模糊多资源应急调度问题,建立了使时间约束满意度最大的模糊数学规划模型,给出了求解算法。
The fuzzy mathematical programming model of the scheduling decision in fuzzy multi-resource emergency is established, an algorithm of the greatest satisfaction degree for time restraint is proposed.
在城市生活垃圾系统决策中,常常需要确定合适的目标或规划,而模糊数学决策法是有效的定性方法之一。
Suitable objective or a plan is often determined for systematic decision of urban domestic refuse, and fuzzy mathematics decision method is one of the effective qualitative methods.
本文介绍了用于专门人才预测和规划中的若干模糊数学方法。
This paper presents some methods of fuzzy mathematics to forecast and plan for special talent.
通过模糊集合运算与算子变换把模糊数学模型最终转化为一个0-1整数规划问题。
Then, the fuzzy set-covering model is transformed to a 0-1 integer planning problem through fuzzy set operation and operator transformation.
对模型的求解问题,本文采用模糊数学法、动态规划法、最优路方法、整数规划法等多种方法进行深入的研究。
For seeking a method to solve the model, it introduced blur math method, dynamic programming method, the way of optimization and integer programming method etc.
本文利用模糊数学方法对水泥原料的配比进行了讨论,提出了三组配料的模糊规划模型。
This article uses fuzzy mathematical method to discuss the raw meal proportioning of cement and presents a fuzzy programming model for three raw materials mixed.
本文利用模糊数学方法对水泥原料的配比进行了讨论,提出了三组配料的模糊规划模型。
This article uses fuzzy mathematical method to discuss the raw meal proportioning of cement and presents a fuzzy programming model for three raw materials mixed.
应用推荐