为满足对燃气-蒸汽联合循环发电机组培训的需要,研制了390MW液化天然气(LNG)联合循环发电机组仿真机。
For fulfilling the instant need of operation training for gas-steam combined cycle unit, the simulator for 390 MW LNG gas-steam combined cycle unit was developed.
针对鞍钢燃气蒸汽联合循环发电机组(CCPP)在调试投产过程中出现的问题及对整个煤气系统的影响,采取一系列应对措施解决了问题。
Problems occurred in commissioning of gas-steam combination circulation generating unit(CCPP) and the problems had an effect on the whole gas system.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
应用推荐