给客户的月席报告表明进度偏差为零。
The monthly report to the client shows zero schedule variance.
进度偏差识别与分析方法。
成就水平活动不会显示进度偏差,这项技术因此就偏向于那些照计划进行的项目数据。
LOE activities will never show a schedule variance. Consequently, the technique always biases the project data toward an on-schedule condition.
该方法的运用能够提高项目进度管理精度,保证项目在可接受的进度偏差范围内完成。
The application of the method can help improve the accuracy of project scheduling management, ensure project completion within the acceptable deviation.
在工程进度曲线的基础上,根据进度曲线所提供数据,运用灰色系统理论,建立一种进度偏差预测模型。
On the basis of the project progress curve and according to the data from it, the grey system theory is applied to establish a model for the prediction of progress deviation.
进度或预算的偏差开始变大,尤其在项目早期的时候。
A small variance in schedule or budget starts to get bigger, especially early in the project.
采用计划和跟踪管理方法,并且超出进度来计算偏差,或者。
Adopting a plan-and-track governance method and moving out the schedule to account for the variance, or.
摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。
ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.
巡视各岗位,检查工作进度,抽查服务质量,纠正偏差,确保日常工作顺利进行。
Make rounds on each position, test their quality of service, correct their fault, make sure the daily work can go on smoothly.
该方法涵盖从进度缓冲设置到偏差标准的设定,再根据偏差标准和缓冲对项目进行监控的全过程。
The method covers the whole process from setting scheduling buffer to determining deviation standard, monitoring and controlling according to the buffer and deviation standard.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.