• 连续刚构桥大体积混凝土浇注桥梁施工关键工序之一

    Casting mass concrete of pile caps in long-span continuous rigid frame bridge is one of the key processes during bridge construction.

    youdao

  • 目前大跨径预应力混凝土连续刚构桥连续梁桥悬臂浇注施工主要采用的施工设备

    The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.

    youdao

  • 若将预拌混凝土生产施工结合,利用混凝土搅拌运输车进行中间运送实现混凝土连续泵送浇注

    It can realize the pump transport and concrete agitation continuously by corresponding with concrete produce and pump construction, and using the concrete agitation truck to transport the concrete.

    youdao

  • 研究目的预应力混凝土连续采用满布支架施工时,常常因为现场浇注混凝土过大,而不得不分段进行施工。

    Research purposes: the segmental casting method is often used in the full framing construction of prestressed concrete continuous girder because concrete casting in-site is too much.

    youdao

  • 我国已经建成跨度预应力混凝土连续梁桥的实践来看,大部分采用悬臂浇注法施工。

    In the great span prestressed concrete continuous Bridges which already completed in our country, the majority were constructed by the cantilever concreting.

    youdao

  • 我国已经建成跨度预应力混凝土连续梁桥的实践来看,大部分采用悬臂浇注法施工。

    In the great span prestressed concrete continuous Bridges which already completed in our country, the majority were constructed by the cantilever concreting.

    youdao