文章以苏州工业园区金墅国际公寓静压管桩施工为例,介绍了静压管桩施工对周边管线、建筑物安全的影响及施工中采取的措施。
This paper states some problems in static pressure tube pile construction according to engineering practice and accident analysis of construction quality supervision.
依据流体动力学原理,利用日光温室管网灌溉的静压能和文丘里管的特性,设计出在日光温室正常灌溉情况下的自动施肥系统。
An automatic topdressing system was designed on the base of the principle of hydrokinetics using energy of static pressure for pipe irrigation and the feature of Venturi pipe in solar greenhouse.
执行绕机检查,确保静压孔、空速管、全空温探头没有损坏和堵塞,检查静电放电刷、雷达罩锁和迎角传感器没有损坏。
Carry out external walk around, check static ports, pitot tubes, tat probe for no damage and obstruction, check static dischargers, radome latches and Angle of attack sensors for no damage.
利用总压排管进行总压和静压测量,可能向解决这个问题前进一步。
It is possible to go some way towards the solution of this problem by the use of static and pitot comb pressure measurements.
针对柔性应力传递系统,申请了“一种带盲孔的陶瓷管冷等静压成型装置”的专利(已受理)。
For the flexible stress transfer system, we present an application for patent which is a CIP device for molding a ceramic tube with blind hole.
证明了引入管布置型式对减温器阻力系数和静压分布规律并无影响。
Test results show that the drag coefficient and the law of hydrostatic pressure are independent of the entrance tube type.
风机盘管机组由于出口静压的局限性,一旦设计阻力与实际阻力有偏差,对风量会产生很大影响。
For the limitations of exit static pressure of fan coil, the deviation between designed and actual resistance will impact on the wind.
本文通过工程实例介绍了静压预应力高强管桩在某高层建筑中应用的设计思路,利用静压桩终压力估算单桩竖向承载力的设计方法及有关施工技术要求。
The design method to estimate the bearing capacity of single pile base on the final pressure is presented in this paper, and the construction measures are discussed as well.
本实用新型涉及一种干袋法等静压成型机用的可调芯杆,其造型特别适合生产异型陶瓷素坯管、粉末金属管等。
The utility model relates to an adjustable core bar for the dry isostatic pressing forming machine which is especially suitable to produce the special-shaped ceramic flan, the powder metal pipe, ect.
从挤土效应及振动影响、浅层障碍、斜桩、桩身破坏等方面总结了静压预应力管桩施工中的常见问题,并分析了产生的原因,介绍了预防措施,以提高桩的合格率。
What's more, bearing capacities of partially inclined piles, inclined pile-groups and partially inclined piles due to pit excavation are also studied based on the parameters from the back analysis.
从挤土效应及振动影响、浅层障碍、斜桩、桩身破坏等方面总结了静压预应力管桩施工中的常见问题,并分析了产生的原因,介绍了预防措施,以提高桩的合格率。
What's more, bearing capacities of partially inclined piles, inclined pile-groups and partially inclined piles due to pit excavation are also studied based on the parameters from the back analysis.
应用推荐