• 定义追踪项目计划工作分解结构

    Defines and tracks project plan and work breakdown structure.

    youdao

  • 需要草稿中拟定日程表时,工作分解结构(WBS)理解项目工作细节最好方式

    A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.

    youdao

  • 这些可能一个特定项目提议工作分解结构元素上下文环境中。

    These may be within the context of a particular project, proposal or work breakdown structure element.

    youdao

  • 工作分解结构(WBS)用于每个项目

    A work breakdown structure (WBS) is used on every project.

    youdao

  • 首先本文运用工作负荷系统评估系统、项目分解结构以及关键路线构建基于工作负荷点系统的进度度量监控体系

    First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.

    youdao

  • 基于我们以前从事类似项目经验我们已经制订了一个工作分解结构

    Based on our prior experience with such projects, we have developed a work breakdown structure.

    youdao

  • 建设项目分解结构编码体系合理与否很大程度上决定整个项目管理工作绩效水平

    Whether the breakdown structure and coding system of construction project is reasonable or not decides the performance level of the entire project management to a large degree.

    youdao

  • 工作分解结构项目工作分成较小便于管理多项工作下降一个层次意味着项目工作更详尽的说明。

    The WBS subdivides the project work into smaller, more manageable pieces of work, with each descending level of the WBS representing an increasingly detailed definition of the project work.

    youdao

  • 工作分解结构当前批准项目范围说明书规定工作

    The WBS represents the work specified in the current approved project scope statement.

    youdao

  • 一个产品开发项目项目经理这个项目工作分解结构四个层次按顺序使用线图技术

    You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.

    youdao

  • 项目管理中的WBS(工作分解结构)概念引入工程报价软件中,将大大提高工程造价计价准确性造价控制的效率

    Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.

    youdao

  • 经过批准的详细项目范围说明书,相应的工作分解结构,以及工作分解结构词汇表项目的范围基准。 !

    The approved detailed project scope statement and its associated WBS and WBS dictionary are the scope baseline for the project.

    youdao

  • M1我们开发一个工作分解结构产品项目分解结构

    In M1 we have develop a Work Breakdown Structure and Product Breakdown Structure for a project.

    youdao

  • 详细阐述了简要、合同工程项目工作分解结构用途建立方法

    It describes in detail the usage and establishment methodology for sunmma- ry WBS, contract WBS and engineering project WBS.

    youdao

  • 另外请见工作细目控制帐目合同工作分解结构项目概括性工作分解结构

    See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.

    youdao

  • 工作分解结构应当项目团队执行以便实现项目目标创造必要交付成果的工作,按可交付成果所做的层次分解

    A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables.

    youdao

  • 工作分解结构应当项目团队执行以便实现项目目标创造必要交付成果的工作,按可交付成果所做的层次分解

    A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables.