The mathematical model for two-phase flow and heat transfer of wet steam in exhaust pipe for a 600 MW power generating unit with direct air cooling is established.
建立了600MW发电机组直接空冷排汽管道内湿蒸汽两相流动和传热的数学模型。
Several kinds of faults with the EH system that occurred in initial operation period of a native-made 600 MW steam turbine unit were introduced in this paper.
文章介绍了某电厂600MW汽轮机组投产初期EH系统发生的各种故障,通过对故障进行分析研究,指出故障发生的根本原因及处理方法。
A remodeling design of circulating pump of 600 MW power unit is introduced which adopts different conversion factors for the impeller and guide blade according to the same model pump.
介绍了600MW火电机组用大型立式循环水泵的一种改型设计方法,即针对同一模型,叶轮与导叶体采用不同的换算系数进行设计。
The fracture of blind plate bolts on a coal gas heater of 350 MW gas turbine unit were systematically characterized and analyzed by a series of macroscopic and microscopic analysis methods.
采用宏观和微观分析法对350MW燃气轮机组煤气加热器盲板螺栓断裂进行了系统的表征分析。
The furnace waterwall fouling and slagging of a 200 MW coal fired unit at Fuxin Power Plant is tested and data specimens have been gained.
对辽宁省阜新电厂200MW机组燃煤锅炉进行了多工况热态测试,获得了数据样本。
CFD software is used to perform 3-d numerical simulation of steam flow field inside direct air-cooling exhaust steam pipe of a 660 MW supercritical unit.
利用计算流体动力学软件(CFD),对某660MW超临界发电机组直接空冷排汽管道内的水蒸汽流场进行了三维数值模拟研究。
The RB functional test on a 350 MW generating unit and test result analysis were introduced.
介绍了3 5 0MW机组RB功能的试验过程及结果分析,对其它机组具有一定的参考价值。
The RB functional test on a 350 MW generating unit and test result analysis were introduced.
介绍了3 5 0MW机组RB功能的试验过程及结果分析,对其它机组具有一定的参考价值。