• Including: 1, Before installation: 2 the open-package inspection and acceptance of the equipment, the inspection and calibration equipment foundation, 3 the main equipment and auxiliary equipment 4.

    包括1安装准备;2设备开箱检查验收,各设备基础的检查和校正3主要设备和辅助设备的就位;4、锅炉烟道系统的制作及安装。

    youdao

  • Including: 1, Before installation: 2 the open-package inspection and acceptance of the equipment, the inspection and calibration equipment foundation, 3 the main equipment and auxiliary equipment 4.

    包括1安装准备;2设备开箱检查验收,各设备基础的检查和校正3主要设备和辅助设备的就位;4、锅炉烟道系统的制作及安装。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定