• The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.

    湿物料主要喷雾干燥结构雾化器结构、安装操作以及热风内的运动状态有关。物料熔点低于干燥温度时容易产生热熔性粘壁。

    youdao

  • The result shows:for air source of high sprayer, mixed flow fan is suitable.

    计算结果说明喷雾化机风源,斜流式风机比较适宜。

    youdao

  • Axial flow fan is one of the important part on the air-blast sprayer.

    流式风机许多风送式喷雾机重要部件之一

    youdao

  • This paper describes the mechanism of spraying device with combined disc and air-blast atomization for the 1.18kW. Power operated knapsack sprayer and its characteristics.

    探讨用于1.18千瓦背负式机动喷雾转盘气力组合雾化多用喷雾装置的雾化机理及其特点

    youdao

  • Remove its plastic head, aim it at the admitting pipe of the air filter, push the sprayer, spray it for 1-3 seconds and then start the engine.

    塑料盖后对准空气滤清器的进气管喷头1 ~ 3,然后启动即可。

    youdao

  • The machine comprises three parts which are a power supply, an air pressure jet flow air-water mixture sprayer and a gas source of an oxygen source ozone generator, and the like;

    它由电源气压射流气水混合喷雾器氧气臭氧发生器气源大部分组成

    youdao

  • The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.

    介绍用于立式压力喷雾干燥热风分配器改造后结构工作原理。

    youdao

  • The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.

    介绍用于立式压力喷雾干燥热风分配器改造后结构工作原理。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定