• To achieve 50 percent energy saving standards of construction as an example, is based on an increase in the original 5-8 percent increase in construction costs can be recovered through energy savings.

    达到节能50%标准建筑原来基础增加五到八个百分点,增加的造价通过节约能耗收回

    youdao

  • To achieve 50 percent energy saving standards of construction as an example, is based on an increase in the original 5-8 percent increase in construction costs can be recovered through energy savings.

    达到节能50%标准建筑原来基础增加五到八个百分点,增加的造价通过节约能耗收回

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定