• Air blower aeration was adopted in Shaoxing Wastewater Treatment Plant, where exist some disadvantages, such as the falling-off of blind lid from aerated pipe and malfunction of drainage system.

    绍兴污水处理厂采用鼓风气,在运行过程中存在曝气管脱落现象,排水系统也存在缺陷

    youdao

  • To analyze the effect of the blind drainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.

    探讨排水路基碎石加固土地工程特性影响进行了路基试验段对比试验路堤填筑施工中进行了孔隙水压力和地基沉降测试。

    youdao

  • To analyze the effect of the blind drainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.

    探讨排水路基碎石加固土地工程特性影响进行了路基试验段对比试验路堤填筑施工中进行了孔隙水压力和地基沉降测试。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定