• This project probe into the procedures and techniques for validating the structure of complex faulted-block with applications to Huanghua basin.

    本项目的任务是以黄骅盆地某些油田例,探讨复杂断块构造构造确认程序方法

    youdao

  • The studying fault block is a typical complex faulted block reservoir, which is with many faults, fractured structure, strong heterogeneity and great difficulty in exploration.

    典型复杂油藏区内断层,构造破碎,非均质性,开发难度较大。

    youdao

  • The studying fault block is a typical complex faulted block reservoir, which is with many faults, fractured structure, strong heterogeneity and great difficulty in exploration.

    典型复杂油藏区内断层,构造破碎,非均质性,开发难度较大。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定