When more than one boiler is connected to the main steam header, a stop check valve should be installed in the pipeline between each boiler and the header.
如果连接主蒸汽热水器的锅炉不止一个,则在每个锅炉与热水器之间的管路上都应该安装一个截止止回阀。
1 before the fire, steam boiler, should check the valve pipe, steam pipe, pressure gauge, safety valve, water level gauge, drain valve is in good condition.
蒸汽锅炉生火之前,应检查各阀门水管、汽管、压力表、安全阀、水位表、排污阀等是否处在完好状态。
1 before the fire, steam boiler, should check the valve pipe, steam pipe, pressure gauge, safety valve, water level gauge, drain valve is in good condition.
蒸汽锅炉生火之前,应检查各阀门水管、汽管、压力表、安全阀、水位表、排污阀等是否处在完好状态。
应用推荐