The existing problems in bottom tower control of butadiene rectifying tower in certain plant are investigated. The inference control strategy based on soft measurement is stated.
研究了某厂丁二烯精馏塔塔底控制回路目前存在的问题,提出了基于软测量的推断控制方案。
The existing problems in bottom tower control of butadiene rectifying tower in certain plant are investigated. The inference control strategy based on soft measurement is stated.
研究了某厂丁二烯精馏塔塔底控制回路目前存在的问题,提出了基于软测量的推断控制方案。
应用推荐