The feasibility study is the important content in the period of the earlier constructing time, and is the constituent of the capital construction procedure.
可行性研究是建设前期工作的重要内容,是基本建设程序中的重要组成部分。
In order to ensure safety in nuclear power plant, must according to capital construction procedure, complete one's work of prospecting, especially give and appraisal of paraclase.
为了确保核电厂安全,应按基建程序完成勘测各阶段任务,特别是对断层的鉴定与评价。
Contents summary: Each item engineering construction at design and construction before, have to carry on rock soil engineering to investigate according to the capital construction procedure.
内容摘要:各项工程建设在设计和施工前,必须按基本建设程序进行岩土工程勘察。
The CRC construction plan shall be organized and carried out after approval according to the procedure of capital construction set by the State and this Municipality.
轨道交通建设计划按照国家和本市规定的基本建设程序批准后组织实施。
Article 22 Highways shall be built in accordance with the procedure for capital construction prescribed by the State and the relevant regulations.
第二十二条公路建设应当按照国家规定的基本建设程序和有关规定进行。
This article puts forward the approach and the procedure for value engineering analysis of large-scale projects and applies them to the construction of the second Beijing Capital Airport.
提出了大型项目价值工程分析方法和流程,并将其应用于北京首都第二国际机场项目。
This article puts forward the approach and the procedure for value engineering analysis of large-scale projects and applies them to the construction of the second Beijing Capital Airport.
提出了大型项目价值工程分析方法和流程,并将其应用于北京首都第二国际机场项目。
应用推荐