After the system change of capital centralization was done, the main economical stimulation was nonmaterial, and the trade cost was the plan cost.
资本集中化制度变迁后,经济活动以非物质激励为主,交易成本表现为计划成本。
After the system change of capital centralization was done, the main economic incentive was nonmaterial, and the transaction cost was the planning cost.
资本集中化制度变迁后,经济活动以非物质激励为主,交易成本表现为计划成本。
After the system change of capital centralization was done, the main economic incentive was nonmaterial, and the transaction cost was the planning cost.
资本集中化制度变迁后,经济活动以非物质激励为主,交易成本表现为计划成本。
应用推荐