Construction of foundation tunnel of multiple building of Changsha traffic cop detachment was very difficult with complicated geological condition, rich water and much flow-sand.
长沙市交警支队技术综合大楼地质条件复杂,水量丰富,流砂严重,基坑施工相当困难。
Construction of foundation tunnel of multiple building of Changsha traffic cop detachment was very difficult with complicated geological condition, rich water and much flow-sand.
长沙市交警支队技术综合大楼地质条件复杂,水量丰富,流砂严重,基坑施工相当困难。
应用推荐