• Therefore, the scheme of four cages that are disposed on the side of concave bank is the last scheme according to the practical engineering problem.

    因此针对所要解决工程实际问题决定采用紧靠凹布置道斜底的方式作为最终消减急流冲击波方案

    youdao

  • The results reveal that after the impounding, Tunaozi Shoal transformed basically from convex-bank entrenched meander to shallow broad river, and will further develop to a concave-bank deep channel.

    分析表明,蓄水后土脑子河段已基本完成凸岸深切河曲河曲变化的过程,将会进一步转化岸深槽的河曲。

    youdao

  • The results reveal that after the impounding, Tunaozi Shoal transformed basically from convex-bank entrenched meander to shallow broad river, and will further develop to a concave-bank deep channel.

    分析表明,蓄水后土脑子河段已基本完成凸岸深切河曲河曲变化的过程,将会进一步转化岸深槽的河曲。