It includes concrete core block and external insulating layer.
它包括混凝土芯块和外保温层。
The curtain wall will enclose a composite concrete core with steel framing.
幕墙将包裹合成的带有钢铁框架的混凝土主核。
Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.
沥青混凝土心墙堆石坝是土石坝的主要坝型之一。
The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
This paper describes a test study method of mat base material mix for asphalt concrete core wall.
介绍沥青混凝土心墙基座垫层料配合比的试验研究方法。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The tower structure comprises an external steel frame, an elliptical concrete core and steel-framed floors between them.
塔体由椭圆型钢结构外筒和混凝土核芯筒以及连接这两者的钢-混凝土组合结构楼面组成。
In the paper, the finite element method regarding the effects of wetting and creep analysis of asphalt concrete core are studied.
文中还讨论了考虑湿化影响的有限元计算方法,并进行了土石坝沥青混凝土心墙的徐变分析。
The office building is heated and cooled through concrete core activation — using ground water, which is fed into with a heat pump.
通过热力泵传输至混凝土芯部的地下水可调节办公楼的温度;
The office building is heated and cooled through concrete core activation - using ground water, which is fed into with a heat pump.
办公楼通过混凝土核心活化作用采暖和制冷,使用的是地下水,地下水通过热泵送入管道。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The test results show that the bond strength is of concrete, but not affected by the length of the steel tube-concrete core interface.
试验结果表明,混凝土强度、钢管表面状况和混凝土养护条件对粘结强度有显著影响,而界面长度对粘结强度无影响。
With an example, this paper introduce the methods of using Radar and Rebar Locator to test the quality of reinforced concrete core column.
本文通过工程实例,介绍了雷达仪和钢筋扫描仪在某工程钢筋混凝土芯柱质量检测中的应用。
The major dam of Nierji water project is an earth - rockfill dam with asphalt concrete core. The construction diversion is used two stages.
尼尔基工程主坝为沥青混凝土心墙土石坝,主坝工程施工采用两期导流方式。
While the floors are also made from board-marked concrete, the walls and cabinetry built into the concrete core are made from birch plywood.
同时地板也用混凝土模板制作,用混凝土建成核心的墙面和橱柜铺设了桦木胶合板。
The proper application of stiff mixing pile with reinforced concrete core, as a new technique, has attracted the engineering circle's attention.
钢筋混凝土劲性搅拌桩作为一种新兴技术,其合理应用为工程界所关注。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The concrete core extends through three floors at one end of the building and operates as a service island containing stairs, bathrooms and the kitchen.
混凝土柱延伸至建筑物一端的三层,创建了一个包含楼梯、浴室和厨房的服务空间。
Test results indicate that smaller hoop spacing provides higher column capacity and greater strength enhancement in a confined concrete core of columns.
试验结果表明,箍筋间距越小,则柱承载能力越高,混凝土核心约束强度提高幅度越大。
The deformations, strains of tubes, axial bearing capacity, and failure modes of specimens and concrete core were measured and obtained during the test.
采用两种不同的加载方法,获取了各试件的变形、应变、破坏形式及极限承载力,并在试验后观察其内部混凝土的破坏形态。
Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.
茅坪溪防护坝是三峡工程的副坝,也是目前中国最高的沥青混凝土心墙坝。
The reinforced mixing pile is a new kind of composite pile used in soft ground engineering which is composed of cement-soil ring and reinforced concrete core.
劲性搅拌桩是适用于软土地基的一种新型复合桩,桩体由水泥土环桩内包钢筋混凝土芯桩组成。
It is assuredly helpful to well know these characteristics for either proper design of rockfill dam with bituminous concrete core, or reasonable construction.
全面掌握这些特征,无论对沥青混凝土心墙堆石坝的正确设计,还是合理施工,无疑都是有帮助的。
Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.
碾压式沥青混凝土心墙,是将热拌后的沥青混合料按一定的厚度摊铺在铺筑部位上,然后用适当的振动碾碾压成型。
As a high-rise structure, Guangzhou West Tower is composed of a concrete core tube and a special exterior frame which consists of inclining concrete-filled columns.
广州珠江新城西塔是由钢管混凝土斜交网格柱形成的外筒与钢筋混凝土核心筒组成的超高层筒中筒结构体系。
To guarantee the column-free space effect, all the emergency staircases, ventilating pipes and other auxiliary functions are gathered into the central concrete core.
疏散楼梯、通风管道等辅助性功能集中在中央的混凝土核心里,确保获得无柱的展厅。
To guarantee the column-free space effect, all the emergency staircases, ventilating pipes and other auxiliary functions are gathered into the central concrete core.
疏散楼梯、通风管道等辅助性功能集中在中央的混凝土核心里,确保获得无柱的展厅。
应用推荐