An entire model simulating concrete construction process in combination with the concrete pouring without longitudinal, joints of the Three Gorges Project spillway dam is established.
对三峡工程泄洪坝段混凝土通仓浇筑,建立了模拟混凝土施工过程的整体模型。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
So it is necessary to carry out risk analysis and risk management in pouring dam construction to display the virtues of concrete faceplate rock dam and to construct quickly.
因此,要发挥堆石坝的优势,做到快速施工,有必要针对具体的工程进行一定的风险分析与风险管理。
The working range of the concrete pouring equipments on the dragon beach hydroelectric project dam is heavy, overlaps each other, it is high to build the intensity, operation is fast in speed;
龙滩水电工程大坝的主要混凝土浇筑设备的工作范围很大,彼此重叠,浇筑强度高,运行速度快,并且该地区多雾。
In this paper the arithmetic of 2d column drawing and 3d perspective drawing of the concrete pouring for arch dam is studied, and the concrete pouting is simulated by computer.
本文主要研究拱坝混凝土浇筑的二维柱状图和三维透视图的算法,及混凝土浇筑的计算机模拟。
In this paper the arithmetic of 2d column drawing and 3d perspective drawing of the concrete pouring for arch dam is studied, and the concrete pouting is simulated by computer.
本文主要研究拱坝混凝土浇筑的二维柱状图和三维透视图的算法,及混凝土浇筑的计算机模拟。
应用推荐