• When using reinforced-stress gauge to measure structural stresses in prestressed concrete girder bridge, there exist errors between measured values and the theoretical ones because of various factors.

    采用应力测量预应力混凝土桥梁结构应力由于种种原因,将导致测试结果理论计算结果不符。

    youdao

  • Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.

    作为叠合梁斜拉桥,四方台大桥主梁下部的工字钢上部的混凝土行车道板组合而成。

    youdao

  • This paper introduces the concrete pouring of continuous box girder of main structure of the bridge and the tension construction technology.

    重点介绍该桥的主桥上连续箱梁混凝土浇筑以及拉施工技术。

    youdao

  • The approach Bridges of Binzhou Huanghe River bridge are of prestressed concrete continuous girder structures used with C50 high performance concrete.

    滨州黄河大桥引桥预应力混凝土连续梁桥,采用C50高性能混凝土。

    youdao

  • On the basis of fuzzy failure criterion, model of reliability of concrete box-girder bridge is set up, and the reliability of existing bridge is calculated.

    基于模糊失效准则建立混凝土箱梁可靠计算模型计算了一座桥基于模糊失效准则的可靠度。

    youdao

  • Cracking is quite common in prestressed concrete continuous box girder bridge, which influences appearance of component, life span of using, and even safety of structure,.

    预应力混凝土连续箱梁开裂可以说“多发病”,影响着构件外观使用寿命甚至结构安全

    youdao

  • The long-term deflection of Long Span Prestressed Concrete Box-girder Bridge(LSPCBB) is getting more and more serious in terms of structure safety.

    最后,对桥梁设计计算、桥梁混凝土施工及箱梁的防治技术进行论述,开展控制结构长期挠的研究提出了建议。

    youdao

  • It was an emphasis and difficulty for a self - anchored suspension bridge to control the cable shape, internal force and cracking of concrete stiffening girder.

    混凝土加劲线形、内力体裂缝控制悬索桥施工控制重点难点

    youdao

  • The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.

    目前大跨径预应力混凝土连续刚构桥连续梁桥悬臂浇注施工主要采用的施工设备

    youdao

  • To prefabricate box-girder is important in concrete cable-stayed bridge construction, it affects directly the main bridge construction of assembly progress and packing accuracy.

    箱梁预制钢筋混凝土斜拉桥施工中的重要环节,直接影响到主桥施工的吊装进度拼装精度。

    youdao

  • Aiming at the main damage and its causes of a large-span continuous rigid framework bridge, the strengthening measure of adding the external cable to prestressed concrete box girder was introduced.

    针对大跨度连续刚构桥出现主要病害及其原因,介绍了采取增设预应力混凝土箱梁体外加固措施

    youdao

  • Erqi Yangtze River bridge is composite girder cable-stayed bridge with three towers with the longest span in the world, which is connected with steel girder and concrete slab.

    在建的武汉二七长江大桥主梁采用结构,桥面板混凝土结构,主梁桥面板剪力件连接世界上最大跨度结合梁斜拉桥

    youdao

  • However, box girder cracking and long-term midspan deflection are the defects which commonly exist in the long-span prestressed concrete box girder bridge.

    箱梁开裂中下目前大跨预应力混凝土箱梁桥普遍存在病害。

    youdao

  • A 15 storey reinforced concrete shear core building and a steel girder arch bridge have been chosen as case verification.

    实例分析包括15层高钢筋混凝土建筑一座拱桥

    youdao

  • With its excellent section characters, the prestressed concrete box beam plays a main role in the girder bridge.

    预应力混凝土箱梁优良的截面性质梁桥中占据主要地位

    youdao

  • The prestress concrete continuous girder bridge is one of the most widely used in bridge engineering because of its excellent structural system.

    预应力混凝土连续梁桥优越的结构体系成为当今一种广泛采用桥梁形式。

    youdao

  • A health monitoring system for long span prestressed concrete box-girder Bridges was designed to solve bridge safety problems related to structural cracks and excessive deflection.

    为了解决跨度预应力混凝土箱梁出现的严重的安全问题(如结构性开裂和不正常的过度下挠等),设计和构建该类箱梁桥的结构健康监测系统

    youdao

  • In addition, traditional concrete box girder webs inclined crack problem has been more and more prominent, direct threat to the continuous rigid frame bridge normal use.

    此外传统混凝土箱梁腹板裂缝问题也己越来越突出了,直接威胁连续刚构桥正常使用。

    youdao

  • In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.

    介绍跨度不对称曲线预应力混凝土连续梁桥设计桥后试验

    youdao

  • On the prestressed concrete(PC) wide Box girder and the steel and concrete joint section of the bridge, the C55 high performance concrete is used.

    鄂东长江大桥混合斜拉桥,PC箱梁-混凝土结合采用C55高性能混凝土。

    youdao

  • The nonlinear finite element analysis theory and method for the suspension bridge with concrete stiff girder was studied in the chapter 4 and 5.

    第4、5研究混凝土加劲悬索桥非线性精细计算理论计算方法

    youdao

  • The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.

    广州东沙大桥独塔边跨带辅助墩混合双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重临时荷载、结构刚度混凝土收缩变这些因素混合梁斜拉桥成桥状态影响

    youdao

  • The superstructure of the main spans of Jincheng Bridge in Wuxi is a prestressed concrete continuous box girder with its longitudinal and transverse prestressing ducts grouted by vacuum method.

    无锡金城大桥主跨上部结构预应力混凝土连续箱梁横向预应力孔道压浆采用真空辅助压浆工艺。介绍该真空辅助压浆的施工工艺。

    youdao

  • In this paper, prestressed concrete continuous girder bridge is studied by using finite element analysis tool with support project.

    本文预应力混凝土连续梁桥研究对象,采用有限元分析手段结合依托工程进行研究。

    youdao

  • By test, we will know more about prestressed concrete semi-rigid frame continuous box girder bridge.

    通过试验,使我们对于预应力混凝土刚构-连续梁桥了进一步认识

    youdao

  • By test, we will know more about prestressed concrete semi-rigid frame continuous box girder bridge.

    通过试验,使我们对于预应力混凝土刚构-连续梁桥了进一步认识

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定