• Through project example, the temperature monitoring of mass concrete and application of comprehensive temperature control measures in engineering construction of mass concrete were introduced.

    通过工程实例介绍了大体积混凝土温度监测综合温控措施大体积混凝土工程施工中的应用

    youdao

  • Started from the analysis of gate concrete temperature control, the paper made a brief study on temperature control methods and construction control measures in the process of construction.

    为解决这一难题,本文水闸混凝土温度控制问题分析入手水闸混凝土施工过程中的温控方法施工控制措施进行简要探究。

    youdao

  • Therefore well controlling of difference in temperature and temperature strain are important measures on concrete cracking control.

    因此控制内外温差温度变形防止大体积混凝土出现裂缝重要方法

    youdao

  • Therefore, a series of technical measures are adopted in actual construction has taken for temperature control of concrete construction.

    因此实际施工中采取了一系列技术措施混凝土施工进行温度控制

    youdao

  • The approximate calculation methods to control the cracks in the top wall of brick and concrete structure due to temperature difference and the related precaution - ary measures are put forward.

    提出控制砖混结构温度裂缝近似计算方法以及有关防治措施

    youdao

  • In this paper effective measures are supplied on how to control crevice in large concrete baseplate caused by big temperature changes when building.

    控制温差导致体积混凝土基础底板裂缝本文提出行之有效的应对措施

    youdao

  • The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .

    介绍三峡工程永久船闸地面混凝土1999年夏季施工中所进行的各种温控措施

    youdao

  • This paper briefly introduces the main results of temperature control measures and temperature super vision of mass concrete of main tower of Jingzhou Yangtze River Highway Bridge.

    简要介绍了荆州长江公路大桥混凝土体积混凝土监控措施温度温测主要结果

    youdao

  • Pipe cooling is one of the most temperature control measures of concrete of arch DAMS.

    水管冷却拱坝混凝土主要温控措施之一

    youdao

  • During dam concrete construction, relevant temperature control measures are adopted in different seasons.

    针对不同季节大坝混凝土

    youdao

  • Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.

    简述三峡工程永久船闸闸首边墙混凝土高温季节施工温控措施

    youdao

  • Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.

    简述三峡工程永久船闸闸首边墙混凝土高温季节施工温控措施

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定