Import import trap or trap is known for the steam pipe network and devices, can automatically discharge condensate, air and other non-condensing gas, and blocking water vapor leak valve.
进口疏水阀或称进口疏水器是用于蒸汽管网及设备中,能自动排出凝结水、空气及其它不凝结气体,并阻水蒸汽泄漏的阀门。
When the water level of condensate in the drain sump goes up, the cup flows up until it shuts the admission pipe again, the following cycle starts.
当集水仓中的凝结水位升高时,小桶浮起直至再次封闭了进汽管,下一个循环周期开始。
This pan is to protect the property from damage which may occur from normal condensate formation on the tank or leaks in the tank and pipe connections.
这个排水盆有助于保护财产避免遭受由于热水器正常产生的冷凝水,以及热水器或管道连接部位泄漏可能造成的损失。
The steam trap is a valve that releases condensate water in steam pipe network system.
蒸汽疏水阀是一种用于蒸汽管网系统中疏导冷凝水的阀门。
A survey shows that steam wasted more at the condensate pump plant in a steam heating system. Applies apparatus to measure ste am amount at the exhaust pipe in condensate tank.
某蒸汽供暖系统中凝水泵房处蒸汽损耗大,采用仪器直接对凝水箱蒸汽排空管的蒸汽排放量进行实测,给出测量方法。
Through analyzing causes and process calculation of pipe diameter, installation measures is adopted, the water hammer in pipeline of condensate water system has been improved.
针对凝结水系统的水击、水流不畅现象,通过分析原因并对管径进行了工艺计算,采取适当的安装措施,效果显著。
When the water level of condensate in the drain sump drops, the cup to shut the admission pipe falls down, the passage for steam to enter into the valve body is opened.
由于通往阀腔的进汽管被密封,凝结水从集水仓流经进水管进入阀腔,倒吊桶下沉,打开排水阀嘴,周期性的开始排水。
Condensate water automatic pump will discharge the condensed water that contained in open water collector into high jump stand condensate water return pipe with possible existence of pressure.
凝结水自动泵把开口集水罐内的冷凝水排入可能有压力的高架冷凝水回液管内。
The discharge pipe shall be insulated, otherwise may cause the condensate dripping of discharge pipe.
排水管应采用绝热层,否则可能造成排水管冷凝滴水。
A short passage of return pipe on the water discharge pipe may be placed to prevent outside air into evaporator and facilitate the outflow of condensate.
在排水管路上设一小迂回管段,可防止外界空气进入蒸发器内并有利于冷凝水排出。
To enhance condensate removal, pipe slopes should be maximized wherever possible.
为了加强去除冷凝水,管路的坡度应尽可能最大化。
Horizontal section of linked pipe should keep in a position with some slope, in order to remove condensate liquid or gas.
连接导管的水平段应有一定的斜度,以利于排除冷凝液体或气体。
Horizontal section of linked pipe should keep in a position with some slope, in order to remove condensate liquid or gas.
连接导管的水平段应有一定的斜度,以利于排除冷凝液体或气体。
应用推荐