• Every month we shall establish construction schedule.

    每个我们制订建设进度计划

    youdao

  • The construction schedule was plagued by the bad weather.

    天气恶劣使工程进度受阻

    youdao

  • The construction schedule is only a plan, which always has risk.

    施工进度计划只是一个计划存在风险

    youdao

  • The construction schedule and methods of the latter system were put forward.

    提出了干挂石材墙面采用现浇聚氨酯保温隔热系统施工程序方法

    youdao

  • So it looks very important to study the controlment of construction schedule.

    因此施工进度控制问题探讨显得尤为重要

    youdao

  • Our major planning items contain estimating of cost and construction schedule.

    我们主要计划工作项目包括费用预算施工进度

    youdao

  • The automation would decrease driver's fatigue and speed up construction schedule.

    通过自动操纵,减轻了驾驶员作业强度加快施工进度。

    youdao

  • These meetings should include reviewing and updating the construction schedule and the cost estimates.

    这些会议应当包括回顾更新施工进度成本预算

    youdao

  • In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.

    工程施工进度风险分析计算施工进度控制中的重要环节

    youdao

  • Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    施工中的其他工作必须围绕着并适应施工进度计划要求安排。

    youdao

  • These projects were based around and driven by the construction schedule for the buildings, a very sequential process.

    这些项目工作建筑物施工进度驱动的,是一个非常有序过程

    youdao

  • Construction schedule will be issued when accurate dates for Drawings, OFE's is known and after (Builder) as finalised all procurement.

    生产进度表根据图纸精确时间进行编制。所有船厂采购物品确定,明确船东供品。

    youdao

  • This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.

    方法确保施工安全加快施工进度降低施工成本方面具有显著效果

    youdao

  • In roadbed construction, excessive soil is used to fill subgrade because of weather and construction schedule constraints and other reasons.

    公路路基施工中,天气施工工期限制原因,会经常遇到采用过湿填筑路基的情况。

    youdao

  • The groundwater inflow into a tunnel affects not only the construction schedule, cost, stability and safety, but also the groundwater level.

    隧道不但影响施工进度、施工费用稳定安全会引起地下水位的下降。

    youdao

  • The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.

    斯汀专项研究小组质疑提交给白宫考虑报告中的成本设计以及建设计划

    youdao

  • Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.

    因此现代施工项目管理中,对工程进度控制管理成为一项极为重要工作

    youdao

  • Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.

    编制工程进度计划计划控制阶段工期如期完成。

    youdao

  • The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍P 3软件功能特点以及抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    youdao

  • Standard brick upon the occurrence of these problems, construction will be disrupted, serious impact on the building construction schedule and project quality.

    一朝发生这些个疑难题目施工打乱严重影响修建物的施工进度工程质量。

    youdao

  • Standard brick upon the occurrence of these problems, construction will be disrupted, serious impact on the building construction schedule and project quality.

    一旦发生这些问题施工打乱严重影响建筑物施工进度工程质量

    youdao

  • It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.

    编制计划可以很方便调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产控制施工进度。

    youdao

  • Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.

    介绍了硫磺装置组成安装工艺特点施工进度计划质量控制检查

    youdao

  • In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观确定施工进度计划中各分部、分项工程持续时间施工进度计划具有合理性和可行性的保证

    youdao

  • Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.

    模板工序许多情况下施工网络中的关键线路,模板工艺改进常常可以加快施工进度

    youdao

  • In the construction of the centralized control station, the traditional remote control test method is hard to comply with the requirement of construction schedule.

    集控建设中,传统遥控试验方法难以满足建设工期要求

    youdao

  • The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.

    图上直接展示施工进度网络计划时间参数,特别是各工作时差自由时差。

    youdao

  • Understands from city live built bureau, on the premise of ensure the construction quality and safety, are accelerating the construction schedule of each link quality.

    了解到,确保施工质量安全前提下,施工方正在加速每个环节的工程进度

    youdao

  • Understands from city live built bureau, on the premise of ensure the construction quality and safety, are accelerating the construction schedule of each link quality.

    了解到,确保施工质量安全前提下,施工方正在加速每个环节的工程进度

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定