In China, scientific moral construction has achieved some progress, but there are still some problems in it.
在我国,科学道德建设取得了一定进展,但也存在着一些不容忽视的问题。
The paper introduces the scientific management in constructing in order to construct first-class project from construction progress, emigrant placement, project bids and construction management.
文章从施工进展、移民安置、招标工作、施工管理等方面介绍了为把尼尔基水利枢纽建设成一流工程,在施工中进行的科学管理。
It has been discovered that the scientific method, which restricts the scientific object as well as its construction or system, is the internal motive force in the progress of science.
通过对科学史与相关的哲学的考察,我们发现科学方法是科学进步的最内在的动力,它规范了科学对象及其结构或体系。
Therefore, the necessary to strengthen the construction of this kind of fire management, and progress to the material of the public scientific familiar, make scientific prevention.
因此,有关部分必需加强对此类建筑的消防治理,并进步公家对这些材料的科学熟悉,做到科学预防。
Finally indicated that it must count on scientific and technical progress to realize two fundamental change in electric power production and construction.
最后指出,必须紧紧依靠科技进步,努力实现电力生产、建设两个根本性转变。
Finally indicated that it must count on scientific and technical progress to realize two fundamental change in electric power production and construction.
最后指出,必须紧紧依靠科技进步,努力实现电力生产、建设两个根本性转变。
应用推荐