In the foundation treatment for the converter of main plant building of large scale steel mill, it is the first time to replace conventional pile foundation design by grouting technique.
在大型炼钢厂转炉主厂房的地基处理上,首次引进注浆技术取代常规桩基设计。
To introduce the trial production process of ML08Al cold heading steel adopting the process of converter steel-making, LF refining, billet continuous cast and high speed wire rod mill.
介绍采用转炉、l F炉精炼、小方坯连铸机、高速线材轧机生产工艺试制ML 08 A l冷镦钢的过程。
The practice of the process of top-bottom blowing converter-LF refining furnace-billet casting-high speed wire rod mill for producing special TS06 wire-drawing steel wire rod is briefly introduced.
介绍了天钢利用顶底复吹转炉、LF精炼炉、方坯连铸、高速线材轧机工艺生产ts06拉丝专用钢盘条的实践。
The practice of the process of top-bottom blowing converter-LF refining furnace-billet casting-high speed wire rod mill for producing special TS06 wire-drawing steel wire rod is briefly introduced.
介绍了天钢利用顶底复吹转炉、LF精炼炉、方坯连铸、高速线材轧机工艺生产ts06拉丝专用钢盘条的实践。