• The core wall of asphalt concrete with placement was applied to low clam.

    浇筑式沥青混凝土墙多用于,易于施工。

    youdao

  • The reservoir dam is an earth dam with a clay core wall, built earliest in our country.

    水库大坝我国建设最早的碾压粘土石坝

    youdao

  • This paper describes a test study method of mat base material mix for asphalt concrete core wall.

    介绍沥青混凝土墙基座垫层配合比试验研究方法

    youdao

  • The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.

    尼尔基水利枢纽工程主坝结构形式为沥青混凝土砂砾石坝

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...

    碾压式沥青混凝土以及过渡带施工主坝坝体填筑同步进行的。

    youdao

  • Core wall rockfill dam is one of the representative types of the Shuibuya Project on the Qingjiang River.

    堆石坝清江水布垭水利枢纽的代表性坝型之一

    youdao

  • The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.

    实践表明,浇筑式沥青混凝土适用寒冷地区石坝防渗

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • The changes of pore water pressure in the core wall of earth - rockfill dam are generally delayed relating to that of the reservoir level.

    石坝孔隙压力变化滞后水位的升降。

    youdao

  • This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.

    三峡茅坪溪防护石坝沥青混凝土骑缝碾压施工工艺国内首创的施工方法。

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • Several key technical problems on the structural design and construction of the impervious core wall in the transverse cofferdams are expounded in this paper.

    重点论述围堰防渗墙结构设计施工几个主要技术问题

    youdao

  • Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.

    碾压沥青混凝土将热后的沥青混合料按一定厚度摊铺铺筑部位上,然后适当的振动碾压成型。

    youdao

  • It was a new attempt to put a core wall which sit in rubble mound break - water to get good effect of wave attenuation and stop silt and sand from entering a part.

    斜坡堤内设置刚性混凝土墙板增加消浪效果防止泥沙进入港内的一种尝试

    youdao

  • The effect on seepage is small when the opening of cutoff wall crack is less than0.3cm themaximum relative water head at the bottom of lower core wall is only2.02%.

    防渗墙出现裂缝度小于0。 3cm渗流影响不大,防渗墙下游底部最大相对水头值仅为2。 02%;

    youdao

  • The law of observed water level change in piezometric tube is analyzed in this paper. Furthermore, the stability of soil core wall dam on the unsteady seepage is studied.

    分析了刘家峡黄土测压管实测水位变化规律研究了黄土心墙坝非恒定渗流下稳定性

    youdao

  • For deeply recognizing the reliability of the weathered rock and crushed rock soil used as seepage proof material for the core wall, the field compaction test was conducted.

    深入了解认识风化碎石作为防渗可靠性,开展了现场碾压试验研究。结果表明:页岩风化料作为心墙防渗料可行,特别是全、强上混合料,更具有可靠的防渗性能;

    youdao

  • Analyzes the leakage from the asphalt concrete core wall on the river-bed section of Majiagou reservoir from the aspects of temperature, vertical current and current direction.

    温度垂向流向三个方面分析马家沟水库大坝河床沥青混凝土渗漏情况

    youdao

  • According to the safe slope ratio of earth-filled core wall and the seepage calculation of earth dam, a simple method to calculate the core wall thickness of earth dam is given.

    文章从填筑填安全渗透比降为基础,结合土坝的渗流计算,得出土坝心墙厚度简便计算方法

    youdao

  • Finally, the shear strength reduction technique is used to analyze the seismic stability of Nuo Zhadu core wall type rockfill Dam and Chang Heba core wall type rockfill Dam in FEM.

    最后采用有限元强度折减技术分析糯扎渡堆石坝长河坝心墙堆石坝上下游抗震稳定性

    youdao

  • This paper reviews recent research advances of steel-concrete composite structural systems including steel-concrete composite frame structures and frame-core wall hybrid structures.

    以钢-混凝土组合框架结构框架-核心混合结构为对象,综述了在钢-混凝土组合结构体系方面一些研究进展

    youdao

  • In line with the applications of the technique of the plastic concrete core wall in Chishui Reservoir reinforcement engineering, the article analyzes the key points of this technique.

    文章结合塑性混凝土赤水水库除险加固工程应用分析塑性混凝土心墙的施工技术要点

    youdao

  • Results show that the displacement in horizontal direction and the maximum principal stress of core wall will increase to a larger extent if the creep effect of asphalt concrete is considered.

    分析结果表明考虑蠕变效应水平变形最大应力较大增加

    youdao

  • The final failure mode of the model is tension failure of perimeter columns and bottom of core wall on the tension side caused by overturning moment, and the story shear failure mode was not found.

    结构发生剪切破坏最终破坏模式倾覆力矩作用下底部核心筒受受拉外框拉断

    youdao

  • The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.

    庄水库防渗墙加固工程所需高性能混凝土,要求和易早期强度后期强度性能好、低高抗拉强度。

    youdao

  • I know it sounds geeky and useless, but this is the phrase you should have tacked on your wall the entire time you're working on the design. It's the core of what the app is all about.

    知道听起来很差劲,设计工作全过程应该贴到墙上警句整个应用程序的核心部分。

    youdao

  • I know it sounds geeky and useless, but this is the phrase you should have tacked on your wall the entire time you're working on the design. It's the core of what the app is all about.

    知道听起来很差劲,设计工作全过程应该贴到墙上警句整个应用程序的核心部分。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定