Based on the above qualitative analysis, it constructs an inventory optimizing model for manufacturer and storing company respectively, fingers out an optional result of the cost decision variable.
在前面定性分析基础上,分别建立生产型企业和销售型企业有需求提前期的库存优化模型,得出成本决策变量的最优解。
The KBS for optimizing electricity cost was established by researching something about generation cost based on the method of combining mathematic model with knowledge model.
采用数学模型和知识模型相结合的方法,对发电企业的发电成本相关问题进行研究,建立了发电成本优化决策知识库系统。
Based on that, the algorithm for disassembly time and disassembly cost, and a 0-1 programming model of optimizing product's disassembly were established.
在此基础上,提出了拆卸时间和拆卸成本的计算算法及0 1型拆卸优化模型。
Based on that, the algorithm for disassembly time and disassembly cost, and a 0-1 programming model of optimizing product's disassembly were established.
在此基础上,提出了拆卸时间和拆卸成本的计算算法及0 1型拆卸优化模型。
应用推荐