The primary goal of the DTN program is to develop and field network services that deliver critical information reliably even when no end-to-end path exists through the network.
DTN计划的主要目标是开发和部署一项能够具备可靠传输关键信息特性的网络,甚至是在网络中没有端-端路径的情况下。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
论述了图论的技术以及项目管理技术,并且根据图论技术和项目管理技术设计出了关键路径算法以及网络图绘制算法。
This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
As a critical part of MPLS technology, signaling protocol takes the responsibility to establish a data transmission path during adjacent LSRs in MPLS network.
信令协议是MPLS技术的重要组成部分,它的职责是在MPLS网络中建立一条相邻lsr间的信息传输通路。
At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.
同时利用截集区间网络关键路径与模糊网络关键度的关系,计算出所有路径的关键度。
When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.
当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
由于本系统以网络图的形式进行工程管理,因此提供了一个简单、直观制作网络图的平台。
So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.
子网络图还为工程分包提供了计划依据,因此可以根据子网络图来划分工程分包的范围。
So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.
子网络图还为工程分包提供了计划依据,因此可以根据子网络图来划分工程分包的范围。