• Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.

    关键路径进度识别控制项目故障后果,关键设计结构矩阵连接关键链。

    youdao

  • Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).

    关键路径进度识别控制项目故障后果,关键设计结构矩阵连接关键链。

    youdao

  • Critical path scheduling was one of the earliest applications of computers in construction, but it took quite a long time for it to gain wide acceptance.

    计划关键路线计算机建筑行业最早用途之一不过经过段时间一方法得以广泛承认。

    youdao

  • According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.

    根据关键路径串行调度原理,论述活动和后序活动时间参数计算方法,并以实例阐述了计算原理。

    youdao

  • In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.

    方法调度调整过程可以同时处理关键通路非关键通路上节点

    youdao

  • In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.

    方法调度调整过程可以同时处理关键通路非关键通路上节点

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定