Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
Critical path scheduling was one of the earliest applications of computers in construction, but it took quite a long time for it to gain wide acceptance.
计划关键路线是计算机在建筑行业中最早的用途之一,不过经过了很长一段时间,这一方法才得以广泛承认。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。