One issue that will probably surprise our non -.net developers is that it is very hard to determine a controls ID at design time.
有个问题可能会使非。NET平台的开发人员感到非常惊讶:我们很难在设计期间就确定一个控件的ID。
The advantage of typed DataSets is that the.net Framework plumbing allows controls to bind within the designer to help developers visualize the UI at design time.
类型化数据集的优点是:. NET框架允许控件在设计器中进行绑定以帮助开发者看到设计好的用户界面。
At design time, you can place these four controls on a single row, with two additional labels.
设计时,可以将这4个控件放在一行中,这个行中还有两个附加标签。
Represents the horizontal and vertical line segments that are dynamically created in the user interface (UI) to assist in the design-time layout of controls in a container.
表示在用户界面(UI)中动态创建以便在容器中辅助控件的设计时布局的水平和垂直线段。
Properties of controls can be set at design time using the Dialog editor.
在设计时可以使用对话框编辑器来设置控件的属性。
Lists metadata attributes to apply to components and controls so that they are displayed correctly at design time in visual designers.
列出要应用于组件和控件的元数据特性,以便使它们在设计时正确地显示在可视化设计器中。
The following table shows the attributes you can apply to specify the behavior of your custom controls and components at design time.
下表显示了可用于在设计时指定自定义控件和组件的行为的特性。
This enables your tool to provide services and interact with control designers, in order to provide design-time rendering for custom controls.
这可让工具提供服务,并与控制项设计工具互动,为自订控制项提供设计阶段呈现。
If you add the controls at design time, you must set positioning options for each control.
如果您在设计阶段加入控制项,则必须为每个控制项设定位置选项。
In document-level projects, you can add any host control to your document at design time, or you can add content controls and bookmark controls at run time.
在文件层级专案中,您可以于设计阶段将任何主控制项加入至文件,或于执行阶段加入内容控制项和书签控制项。
The following example shows how to add data-bound controls to documents at design time.
下列范例说明如何在设计阶段,将资料系结控制项加入至文件。
Provides an interface to allow a composite-control designer to recreate the child controls of its associated control at design time.
提供一个接口以使复合控件设计器可以在设计时重新创建其关联控件的子控件。
The strict managements and controls are adopted in the construction; and a real-time monitoring and dynamic analysis system which integrates design, research and construction is established.
在施工过程中采用精细化管理对施工进行严格控制,建立设计、科研、施工一体化的实时监测动态分析反馈系统。
In document-level projects, you add controls to your document and bind them to data at design time.
在文件层级专案中,您可以在设计阶段将控制项加入至文件,并将控制项系结至资料。
In document-level projects, you add controls to your document and bind them to data at design time.
在文件层级专案中,您可以在设计阶段将控制项加入至文件,并将控制项系结至资料。
应用推荐