• The main danger in high-rise construction lies in the deep depth of foundation digging, the great height of work place, the much crossover work, the long time for a project.

    高层建筑施工存在危险主要方面有:基础开挖深度作业高度高交叉作业、施工工期

    youdao

  • According to theoretical calculate and water surge and lithology condition when digging into 3 coal, the maximal height of the crack strap is not attach to Quaternary alluvium.

    通过理论计算以及3煤开采打钻过程中所记录岩性和钻孔涌水方面的情况来看,裂隙高度并未达到第四

    youdao

  • According to theoretical calculate and water surge and lithology condition when digging into 3 coal, the maximal height of the crack strap is not attach to Quaternary alluvium.

    通过理论计算以及3煤开采打钻过程中所记录岩性和钻孔涌水方面的情况来看,裂隙高度并未达到第四

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定