Contractor to provide reinforcement free zones block outs dowel bar reinforcement and openings in cast in situ viaduct to facilitate interfacing.
承包商应提供无钢筋区、预留孔堵块、合缝钢筋加固和现浇高架桥内开口,以便接口。
The transfer of shearing and moment must be considered in dynamic analysis because the model of dowel bar affects the modal frequency and modal shape directly.
指出传力杆模型对模态频率和主振型有直接影响,动力分析中应当考虑接缝的剪力传递和弯矩传递。
First of all, production condition and the main forms of the misalignment of dowel bar are determined on basis of referring to relevant research literature and research reports.
首先,从相关的研究文献和实际情况的了解中,明确了传力杆偏位的产生条件和存在的主要形式。
Combined with the construction practice, the paper introduced the design idea of concrete bar dowel for pretensioned grooved stretching bed etc.
根据施工实践,简要地介绍了先张法槽式张拉台座中的砼传力柱的设计思路。
Combined with the construction practice, the paper introduced the design idea of concrete bar dowel for pretensioned grooved stretching bed etc.
根据施工实践,简要地介绍了先张法槽式张拉台座中的砼传力柱的设计思路。
应用推荐