• Serial blasting crater test method was used in underground medium and deep hole mining of Dahongshan copper mine for determining drilling and blasting parameters, and good results were obtained.

    大红山铜矿地下采矿中,采用系列爆破漏斗试验方法确定深孔采矿凿岩爆破参数,取得了好的效果

    youdao

  • The undermine method of well drilling technology once of blasting is put forward as well as the calculation of blasting parameters and the demand of implementation for hole.

    介绍爆破次成井技术在漂塘钨矿应用实践,提出了爆破一次成井掏槽方式,爆破参数的设计计算方法孔的施工要求

    youdao

  • Mining Scheduling System model is mainly used for the optimization of drilling-blasting technical and economic parameters of different platforms.

    矿山开采调度系统主要解决不同平台开采穿孔爆破技术经济参数优化问题。

    youdao

  • Mining Scheduling System model is mainly used for the optimization of drilling-blasting technical and economic parameters of different platforms.

    矿山开采调度系统主要解决不同平台开采穿孔爆破技术经济参数优化问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定