The terminal waste-water should be pretreated using evaporation crystallization technology in a zero-liquid discharge coal-fired power plant with a dry ash removal system.
要在干除灰的燃煤电厂实现真正的废水零排放,需要通过蒸发结晶工艺对末端废水进行处理。
The retrofit engineering work of Xiangfan Power Plants dry ash removal system is being explained with an analytical discussion of the systems collocation and its special features.
介绍了襄樊电厂除干灰系统改造工程,分析了其系统配置及特点,根据调试和运行情况,指出了应注意的问题。
The retrofit engineering work of Xiangfan Power Plants dry ash removal system is being explained with an analytical discussion of the systems collocation and its special features.