• PT secondary voltage step-down is one of the reason which causes the comprehensive error of the electric energy metering equipment.

    而PT二次又是引起电能计量装置综合误差直接原因之一

    youdao

  • In power system, it can excite partial parallel resonance or serial resonance, enlarge the harmonic wave, trigger relay protection system in error and disturb electric power energy metering equipment.

    电力系统可以刺激局部并联谐振串联谐振,放大谐波引发继电保护系统误差扰乱电力能源计量设备

    youdao

  • In power system, it can excite partial parallel resonance or serial resonance, enlarge the harmonic wave, trigger relay protection system in error and disturb electric power energy metering equipment.

    电力系统可以刺激局部并联谐振串联谐振,放大谐波引发继电保护系统误差扰乱电力能源计量设备

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定